A complete energy renovation of the administrative building of the Municipality of Gabrovo, completed in June 2026, with significant energy savings achieved.

The project is aimed at comprehensively improving the energy performance of the administrative building of the Municipality of Gabrovo at 3 Vazrazhdane Square. The building was built in 1970, with a total built-up area of 6,440 sq m. Before the renovation, the main problems were related to the inefficient heating system, high energy consumption and significant costs for electricity and heat.
The project includes energy renovation of the building, including thermal insulation of external walls, complete waterproofing of the roof, modernization of the lighting and construction of a photovoltaic system with a capacity of 80 kWp for own consumption. A new heating system with high-efficiency air-to-water heat pumps and backup gas boilers has been introduced, old heating units have been replaced and an energy management system and real-time consumption monitoring have been implemented.
The project was completed on June 30, 2026. After the renovation, the building achieved energy efficiency class "A". A 74.7% reduction in primary non-renewable energy consumption was achieved, exceeding the initially set target of 63.13%, and the saved carbon dioxide emissions amounted to 375.6 tons per year.
Project No. BG-RRP-4.020-0038 is funded under the National Recovery and Resilience Plan, procedure BG-RRP-4.020 "Support for sustainable energy renovation of public building stock for administrative services, culture and sports".
Implementation period: April 2, 2024 – June 30, 2026